Pacific Cascade Freshman Campus
Issaquah, WA | Architect: Bassetti Architects | Completion Date: 2005
Quantum Consulting Engineers provided structural design for a new 1,000-student 9th grade campus constructed of CMU and steel. To accommodate neighborhood needs, the school initially serves only ninth graders, with plans to expand to a full middle school in the future.
The school's first floor features general classrooms and administrative offices, as well as student services such as counseling space, a cafeteria, computer and media labs, orchestra/band rooms with a stage, a multi-purpose gym, and an auxiliary gym.
The school's second level is divided into two wings. One wing is dedicated to science and technology, featuring labs and classrooms, and the other wing contains general classrooms.
The school also includes an outdoor athletic field, and in the northwest quadrant, a separate library with typical features such as high-bay construction with extensive glazing around the perimeter, sunscreens, and interior soffits.

top
|